Day rate calculator
What to invoice for a week on site, per man per day — with part days rounded the way they should be. Free, nothing to sign up for.
Anything up to half a day counts as half. Most site work runs this way.
- Days billed, each
- 3.5
- People
- 2
- To invoice (net)
- £1,680.00
Round each day up, then add — not the other way round
Totalling the hours for a week and rounding once looks tidier and quietly gives work away. On a full week it often makes no difference at all — which is exactly why it goes unnoticed. It shows up on short turnouts: three separate two-hour visits are a half day each, so one and a half days billed. Add the six hours up first and it rounds to one. Half a day, gone, on a half-day setting.
Each turnout is a day somebody could not be anywhere else. The calculator shows both numbers so the difference is visible rather than asserted.
A rate nobody has set is unknown, not zero
Billing a man’s week at nothing is a bigger mistake than billing it at the wrong figure, because nobody queries a line that is not there. If a rate has not been agreed for a job or a person, the invoice should refuse to be raised rather than quietly total zero.
Every day-rate line is labour
Which matters on a CIS invoice: a day of somebody’s time cannot be materials, so the whole of it is deductible labour. If you subcontract, work the CIS out on the full day-rate total.
A note on what this is
A guide, not advice, and it cannot know everything about your arrangement. Check anything that matters with your accountant.