Back to the written guideA job that takes more than one visitWatch: A job that takes more than one visit1m 28s · with narrationTurn your phone sideways, or tap Full screen once it startsBooking a second visit, the Needs booking list, and the warnings when a day is too full.What is said in this recording0:02Some jobs take more than one visit0:04A wet room over three days. A machine that goes back on the bench next week0:10The Visits card is where a job stops being one block of time0:14Book a visit, and give it a day0:17A time, and how long you need0:19Who is going — or nobody yet, to hold the time while you decide0:23And if two of you are going, tick the second name0:26One visit with two people on it — never two visits for one piece of work0:30Each of them is checked for clashes and hours, same as the one leading it0:34And a note, so the next person knows why that day0:37The diary checks four things before it saves0:40Whether they are already on something. Whether it is inside their working hours0:46Whether the day's work actually fits the day0:48And whether there is time to drive there from the job before it0:52They warn, and still save — you can see the customer, the software cannot0:56Close each one off as it happens, and say how it ended0:59Finished, needs another visit, stopped for parts, or nobody was in1:03All four used the slot. Only the first means nothing more is needed1:09And none of them finishes the JOB — day two of three is a real thing1:13And this is the list that catches what has no time at all1:17Never booked, waiting on a part, or booked for a day that has been and gone1:21Urgent first, then contract work, then oldest. It ranks them — it books nothingRead it instead: A job that takes more than one visitThe same thing written out — every step in order, and the notes that stop a wrong assumption.Part of Appointments, jobs and customers.